Home » Planetary concrete mixer » Energy saving planetary concrete mixer

Energy saving planetary concrete mixer

We can send professional engineers to the working site for energy saving planetary concrete mixer installation, adjustment, and operation training.

Rated 4.9/5 based on 597 customer reviews
Share:
  Content   2021-11-17

Our energy saving planetary concrete mixers are manufactured strictly according to national and international standards, and we take a test on each equipment before delivery.  As a manufactory, we can give you lower price than trade companies. Besides, customers from Alibaba can get a discount and ensurance.

low price planetary concrete mixer price
low price planetary concrete mixer price

The warranty period of our energy saving planetary concrete mixers is one year, and we have a professional after-sale service team to promptly and thoroughly solve your problems. It usually takes 1-3 days for training, 10-15 days for installation, 1-2days for commission, 1-2days for pre-operation.

electric engine concrete pan mixer machine
electric engine concrete pan mixer machine
Inquiry
* Name:
* Email:
Country:
Tel:
* Message:
More Planetary concrete mixer

Cost-effective planetary mixer for refractory material operation precautions
1. Check the content of Cost-effective planetary mixer for refractory material before operation
1. The power supply voltage and other adapter instruments have a reasonable rise and fall range, and the relevant installation should be guaranteed to be correct.
2. The fastening of each transmission system, drive system and other devices, the layout of the feeding system and gears are complete, and the safety measures are in place.
3. The wiring of relevant equipment is correct and will not cause safety hazards
2. Before the operation of Cost-effective planetary mixer for refractory material, conduct an idling test machine to confirm that there is no abnormality.
3. During the operation of the Cost-effective planetary mixer for refractory material, attention should be paid to abnormal conditions and excessive temperature rise of some components. If a problem occurs, it should be stopped for inspection and repaired until it is normal.
4. For Cost-effective planetary mixer for refractory material, the wearing parts should be replaced in time, and the equipment should be adjusted in time to return to normal state.
5. During the use of Cost-effective planetary mixer for refractory material, it is necessary to ensure that the operator can operate the equipment, and it is strictly forbidden to leave the work position during operation.
6. After each shift of Cost-effective planetary mixer for refractory material is completed, it must be cleaned and cleaned in time, the equipment should be lubricated, and the power supply should be cut off.